Bay 12 Games Forum

Please login or register.

Login with username, password and session length
Advanced search  
Pages: 1 [2]

Author Topic: Double checking, RE: Magma, and Irrigation. (mega project planning)  (Read 1597 times)

Dorten

  • Bay Watcher
  • [CAFFEINE_DEPENDENT ]
    • View Profile
Re: Double checking, RE: Magma, and Irrigation. (mega project planning)
« Reply #15 on: March 04, 2010, 01:41:16 am »

Oh, Or maybe it's just for tower caps
Logged
Cacodemon 2nd Leutenant
medals: 8/40
specials: 30/44
badges: 13:8:3:0:0

Malsqueek

  • Bay Watcher
    • View Profile
Re: Double checking, RE: Magma, and Irrigation. (mega project planning)
« Reply #16 on: March 04, 2010, 12:27:43 pm »

Allright, two more silly clarifications...

First being: If I were to pour in two levels of magma and then pour in water, would only the top level of magma solidify? I'm trying to figure out a way that I can get my industrial/waste disposal magma levels in without compromising the pristine, single-piece tower with filthy construction-grade walls/floors.

Similarly, The only thing I can think of for trapping the water levels in would be to construct a floor above the water level, then pour magma and water atop it. There's probably no other way to do it, is there?
Logged
Pages: 1 [2]