You send the design for the approval of the Parliament.
The Parliament approves.
Stardate 25.4
The hull of UEPC Oceanic is being built at the Titan Drydocks!
Stadate 25.5
As the cruiser is being constructed, there's a more and more tension in the air. The people of Altair colonies have filled a major complaint against the Parliament, citing that they're working themselves off for benefit of Earth.
There have been also incidents of the rioting and assaults on Parliamentary police forces in Ross 128.
Stardate 25.6
You watch from the window screen as UEPC Oceanic leaves the drydock. The big starship bristles with small turrets, and its quadruple main ion thrusters look like gigantic welding torches.
All-in-all, it costed 22 M.Credits from Ship Design Bureau's budget to construct the ship.
Class name: Oceanic
Traits: Prototype
TYPE: Cruiser
SIZE: Small
Projected Marks:
AFC: 3
HLS: 2
LRO: 3
MAN: 3
PRB: 1
SAR: 1
SCC: 2
Total: 15
Construction cost: 22 M.Credits
---
INCOME:
Parliament Funding: 80 M.Credits
Outsourcing: -
Other: -
Total: 80 M.Credits
EXPENSES:
Research: 30 M.Credits
Infrastructure Maintenance: 30 M.Credits
Prototype Maintenance: -
Salaries: 6.4 M.Credits
Construction of UEPC Oceanic Prototype: 22 M.Credits
Total: 88.4 M.Credits
BALANCE:
Stardate 25.0: 80 M.Credits
Stardate 26.0: 71.6 M.Credits
This ship is now a Prototype, which means it requires to undergo several tests and cruises before it can be said to be truly completed. During the testing, there will be inevitably a reevaluation of its performance and flaws in the design shall become visible.
A) "Pfft, my team did a good job. Let's tell the Parliament we're done - they will reward us for finishing our job before deadline!"
B) "Off to the testing field with you, Oceanic! I don't want to give away a ship that breaks apart when someone pushes the wrong button onboard."