Bay 12 Games Forum

Please login or register.

Login with username, password and session length
Advanced search  
Pages: 1 [2]

Author Topic: This Work Order should be simple, and yet...  (Read 3526 times)

Immortal-D

  • Bay Watcher
  • [Not_A_Tree]
    • View Profile
Re: This Work Order should be simple, and yet...
« Reply #15 on: September 22, 2017, 10:09:34 pm »

Fascinating.  I knew that bins were bugged for ammunition, but thought they were ok for everything else.  I actually just had a Clothier mood, and he was able to retrieve the cloth from a bin.  I have not yet started on Dyes or linked stockpiles, so no issue there (yet).  I think the problem might be that I have my order set to repeat and check daily.  My textile dwarves are spinning the cloth faster than it can be collected, which may result in the cancellation spam.  Your post is a great info dump though, definitely tagging that for future reference :)

anewaname

  • Bay Watcher
  • The mattock... My choice for problem solving.
    • View Profile
Re: This Work Order should be simple, and yet...
« Reply #16 on: September 23, 2017, 02:47:43 am »

With the job manager orders, I set them to more than 1 item and give a reagent buffer, like "weave 10 silk" when "20 silk thread available". This parks the dwarf at the workshop for 10 jobs, and the buffer reduces the chance of conflict with a hauling job.
Logged
Quote from: dragdeler
There is something to be said about, if the stakes are as high, maybe reconsider your certitudes. One has to be aggressively allistic to feel entitled to be able to trust. But it won't happen to me, my bit doesn't count etc etc... Just saying, after my recent experiences I couldn't trust the public if I wanted to. People got their risk assessment neurons rotten and replaced with game theory. Folks walk around like fat turkeys taunting the world to slaughter them.

Immortal-D

  • Bay Watcher
  • [Not_A_Tree]
    • View Profile
Re: This Work Order should be simple, and yet...
« Reply #17 on: September 24, 2017, 12:41:46 pm »

With the job manager orders, I set them to more than 1 item and give a reagent buffer, like "weave 10 silk" when "20 silk thread available". This parks the dwarf at the workshop for 10 jobs, and the buffer reduces the chance of conflict with a hauling job.
For anyone still reading, this was the magic setting that brought my Announcements window under control.  I used 'Job 10, Reagent 16', check monthly'.  The work order often completes several times, and only generates a single cancellation message once per month.
Pages: 1 [2]